Customization: | Available |
---|---|
Driving Type: | Motor |
Material: | Stainless Steel |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Generator data
Voltage Available:
50Hz: 380-400-415V/220-230-240V;
60Hz: 220-380-416-440-480V/110-208-220-240V
Any special voltage is also available as client's request
Prime Power:
Comply with GB/T2820-97(eqv.ISO8528).
Genset can run unlimitedly under certain power range.
One hour 10% over load in every 12 running hours is allowed;
Standby Power:
standby power is the limit value of maximum output for emergency use.
It is off-oil power,overloading is prohibited
Main technical data
Kanpor 4inches 9hp 406cc standard diesel water pump, View diesel water pump, Kanpor Product Details from Kanpor Electrical Machinery Co., Ltd.
agricultural irrigation 4inch gasoline water pump, gasoline motor pump
♦ Pump Specification:
Model | KP40G |
Inlet/Outlet diameter | 100mm(4'') |
Max.Capacity (m³/hr) | 96 |
Max.Head (m/feet) | 31/101.7 |
Self-priming time (s/4m) | 180 |
Max Suction head (m) | 8 |
Type | Single-cylinder,4-stroke,Air cooled gasoline engine |
♦ Engine Specification:
Engine Model | KP270F |
Engine Speed (rpm) | 3600 |
Max Output (Hp) | 9 |
Displacement (cc) | 270 |
Fuel Tank Capacity (L) | 6 |
Net Weight (kg) | 46 |
Dimensions(LXWXH) (mm) | 635*480*565 |
20'FCL (pcs) | 168 |
About Pump Show:
Kanpor 4inches 9hp 406cc standard diesel water pump, View diesel water pump, Kanpor Product Details from Kanpor Electrical Machinery Co., Ltd. on Alibaba.com
(1).The drive is the driving 4-stroke gasoline engine.
(2).The pump is with double impellers design.
(3).The whole frame protect makes sure the pump to own the outstanding capability under the worst condition.
(4).Easy maintain.
Why Choose Us
Diesel generator set/Gas generator set/Alternator: 12 months from shipment date.
Gasoline generator set:6 months from shipment date.
Spare parts:3 months from shipment date.
Factory Inspection: the test items before delivery are mainly as follows:
1.Each genset shall be put into commission more than 4 hours totally. They are tested on idle load, fully
load and 10% overload;
2.The noise level is tested
3.All of the meters on the control panel shall be tested
The appearance of the genset and all of the label and nameplate shall be checked
Ask product operation details, please consult the sales staff by e-mail or Trademanager.