Customization: | Available |
---|---|
Type: | Basic Diesel Generator |
Installation Method: | Fixed |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1MW 1MW 3MW 4MW 5MW 6MW 7MW 10MW HFO HEAVY FUEL OIL HFO GENERATOR SET Power Plant WITH Lloyd register LRQA of CSSC / MAN
/No. | /Item | /Q'ty | /specification | /Scope | |
CMP | Customer | ||||
1./Genset | |||||
1.1 | diesel engine | 3 | CMP-MAN 7L27/38 | ||
One (1) set of diesel engine including following items | |||||
1.1.1 | /Turbocharger | 1 | / With air inlet bend | ||
1.1.2 | /Charger Air Cooler | 1 | Fin and tube type | ||
1.1.3 | /Governor | 1 | |||
1.1.4 | /Flywheel | 1 | |||
1.1.5 | / Common base | 1 | |||
1.1.6 | / Turning device | 1 | /manual operating | ||
1.1.7 | / Starter | 1 | /Pneumatic | ||
1.1.8 | /Lub. oil cooler | 1 | /Plate type | ||
1.1.9 | /Duplex filter | 1 | |||
1.1.10 | /centrifugal by-pass filter | 1 | |||
1.1.11 | / pump for Lub.oil | 1 | /Engine driven | ||
1.1.12 | /Pre-lub. oil pump | 1 | /electrical pump | ||
1.1.13 | /Lub. oil thermostatic valve | 1set | /wax type | ||
1.1.14 | /HT water pump | 1 | /Engine driven | ||
1.1.15 | / HT thermostatic valve | 1set | /wax type | ||
1.1.16 | /Fuel oil leakage alarm | 1 | |||
1.1.17 | /duplex safety filter for fuel | 1 | |||
1.1.18 | /Resilient mountiung | /selected according to alculation | |||
1.1.19 | /flexible hoses for engine all connection | 1lot | |||
1.1.20 | Service platform | 1 | |||
1.2 /Generator | |||||
1.2 | /Generator | 3 | :2217.6kW/rating output from generator terminal is 2217.6kW , |
||
- /Capacity | 2772kVA / 750 rpm at ISO condition | ||||
- /No. of phase and wire | 3 phase / 4 wire / PF 0.8 | ||||
- /Voltage and frequency | 11V / 50 Hz | ||||
- Insulation Class/Temp.Rise | F/F | ||||
- /IP Class | IP23 | ||||
- /Electric system parts | /Maker's standard | ||||
/ One(1) set of Generator including following items ; | |||||
1.2.1 | /AVR | ||||
1.2.2 | / Space heater | ||||
1.2.3 | /Bearing sensor | ||||
1.2.4 | /Winding sensor | ||||
2. fuel oil system | |||||
2.1 | / HFO treatment process unit | 1 | xxxcSt/50ºC/design according toxxxcSt/50ºC HFO | ||
One (1) set of HFO treatment process unit including following items | |||||
2.1.1 | /HFO purifier unit | 1+1 | ,1500L/h /one use and the other reserve,effective separating amount approx850L/h | ||
2.2 | /Diesel oil supply process unit | 1 | |||
One (1) set of Diesel oil supply process unit including following items | |||||
2.2.1 | /Do supply pump | 1+1 | ,2.5m3/h/one use and the other reserve,rate of flow is approx2.5m3/h | ||
2.2.2 | /press. regulatuiong valve | 1 | |||
2.2.3 | /press. regulatuiong valve | 1 | |||
2.2.4 | / DO cooler | 1 | 15kW/approx 15kW | ||
2.3 | /HFO supply unit | 1 | xxxcSt/50ºC/design according toxxxcSt/50ºC HFO | ||
One (1) set of Diesel oil supply process unit including following items | |||||
2.3.1 | /HFO supply pump | 1+1 | ,1.2m3/h/one use and the other reserve,rate of flow is approx 1.2m3/h | ||
2.3.2 | /filter | 1 | |||
2.3.3 | /junction box | 1 | |||
2.3.4 | , base frame, support and pipe | 1lot | |||
2.4 | /HFO booster unit | 1 | xxxcSt/50ºC/design according toxxxcSt/50ºC HFO | ||
One (1) set of Diesel oil supply process unit including following items | |||||
2.4.1 | /auto back flushing filter | 1 | |||
2.4.2 | /return oil tank witth deaerating valve | 1 | |||
2.4.3 | /recycling oil pump | 1+1 | ,3.5m3/h/one use and the other reserve,rate of flow is approx 3.5m3/h | ||
2.4.4 | /heater | 1 | |||
2.4.5 | /viscosity control unit | 1 | |||
2.4.6 | /change-over valve for HFO /DO | 1 | |||
2.4.7 | ,,,/pipe, supprort,flange and base frame | 1 | |||
2.4.8 | / cooler | 1 | |||
2.4.9 | /press. regulatuiong valve | 1 | |||
2.5 | / fuel oil discharging process | ||||
2.5.1 | /leakage fuel oil collecting tank | 3 | 100L/approx 100L | ||
2.5.2 | /fuel oil drain pump | 3 | /pneumatic dredge pump | ||
3. Lubricating oil system | |||||
3.1 | /Lubricating oil treatment process | ||||
3.1.1 | / Lub. oil separator unit | 3 | ,760L/h/ steam heater,effective separating amount approx 230L/h | ||
3.2 | /lube pump system | 1 | |||
4. Cooling water system | |||||
4.1 | () Engine cooling water system(one-string system) | ||||
4.1.1 | /Expansion tank | 1 | 1.5m3/approx 1.5m3 | ||
4.1.2 | /LT water pump | 3 | /electrical driven | ||
4.1.3 | /air radiator | 3 | |||
4.1.4 | / Preheater Unit | 1 | |||
4.2 | /Cooling water supply system | ||||
4.2.1 | /Water treatment unit | 1 | |||
4.2.2 | /Water tank and perssurised system | 1 | |||
5. Compressed air system | |||||
5.1 | /air compressor | 1 | |||
/ One(1) set of air compressor unit including following items ; | |||||
5.1.1 | /air conpressor | 2 | 11/air conpressor one use and the other reserve | ||
5.1.2 | / comperssed air vessel | 2 | ,1.5m3/one use and the other reserve approx 1.5m3 | ||
5.1.3 | /Reduce pressure unit | 1 | 30bar8bar | ||
5.1.4 | /air dryer | 1 | |||
6. , Intake and exhaust gas system | |||||
6.1 | /Intake air system | ||||
6.1.1 | /Intake air filter | 3 | |||
6.1.2 | /Intake air silencer | 3 | |||
6.1.3 | /expansion joint forT/C inlet | 3 | |||
6.2 | /Exhaust gas system | ||||
6.2.1 | /exhaust gas silencer | 3 | |||
6.2.2 | /Expansion joint for T/C outlet | 3 | |||
6.2.3 | /Expansion joint for exhaust gas silencer in/out | 3 | |||
6.2.4 | /Exhaust gas stack | ||||
6.3 | /exhaust gas boiler system | ||||
6.3.1 | /Exhaust gas boiler | 3set | |||
6.3.2 | /Hot well tank | 1 | |||
6.3.3 | /Temp. control valve for Hot well tank | 1 | |||
6.3.4 | /condensator radiator | 1 | |||
6.3.5 | /steam distribution head | 1 | |||
6.3.6 | /Blow down tank | 1 | |||
6.3.7 | /feed water pump unit | 1set | 2,/every set include two pumps,one use and the other reserve | ||
6.3.8 | /chemical dosing unit | 1 | |||
7. Sludge oil treatment system | |||||
7.1 | /waste oil discharge pump | 1+1 | |||
7.2 | /engine room pit pump | 1+1 | |||
7.3 | /pump room pit pump | 1+1 | |||
8. Tank farm | |||||
8.1 | /tanks | ||||
8.1.1 | /HFO storage tank | 1 | 700M3 | ||
8.1.2 | / heater for HFO outlet the tank | 1 | |||
8.1.3 | 1 | 100m3 | |||
8.1.4 | /HFO service tank | 1 | 100m3 | ||
8.1.5 | /DO storage tank | 1 | 100m3 | ||
8.1.6 | /DO service tank | 1 | 100m3 | ||
8.1.7 | /New lub. oil storage tank | 1 | 100m3 | ||
8.1.8 | /Used lub. oil storage tank | 1 | 50m3 | ||
8.1.9 | /Oily Water Pond | 1 | |||
8.1.10 | /sludge tank | 1 | 50m3 | ||
8.2 | /Raw water supply system | ||||
9. Electrical System | |||||
9.1 | /Engine control cabinet | 3 | |||
9.2 | /outgoing cabinet | 1 | |||
9.3 | /insulate cabinet | 1 | |||
9.4 | /auxiliaries equipment cabinet | 3 | |||
9.5 | /Common auxiliaries equipment cabinet | 1 | |||
9.6 | /transform incoming cabinet | 1 | |||
9.7 | /transform outgoing cabinet | 1 | |||
9.8 | /plant transform | 1 | |||
9.9 | /PT cabinet | 1 | |||
9.10 | /Black start genset | 1 | |||
9.11 | /Black start engine cabinet | 1 | |||
9.12 | /central control | 1 | |||
9.14 | /DC system | 1 | |||
10. Spare parts | |||||
10.1 | /Engine spare parts | ||||
10.1.1 | /Standard spare parts for engine | 1set/plant | |||
10.1.2 | /commissioning spare parts for engine | 1set/plant | |||
10.2 | /Plant spare parts | ||||
10.2.1 | /spare parts for generator | 1set/plant | |||
10.2.2 | /spare parts for auxiliaries | 1set/plant | |||
10.3 | /engine tools | ||||
10.3.1 | /Standard tools for engine | 1set/plant | |||
10.4 | /plant tools | ||||
10.4.1 | /tools for mechnical equipment | 1set/plant | |||
10.4.2 | /tools for electrical panel | 1set/plant | |||
11. , piping and electrical material & work | |||||
11.1 | /Material | ||||
11.1.1 | /Materials for civil and foundation items | ||||
11.1.2 | /Materials for mechnical items | ||||
11.1.3 | /Materials for electrical items | ||||
11.2 | / guide installation work | ||||
11.2.1 | /installation/erection works for mechnical items | ||||
11.2.2 | /installation/erection waorks for electrical items | ||||
12. , civil & building material & work | |||||
12.1 | /civil work | ||||
12.1.1 | /site survey | ||||
12.1.2 | /site grading and leveling | ||||
12.1.3 | /Temporary faclity | ||||
12.1.4 | /road and paving | ||||
12.1.5 | /foundation and structure | ||||
12.1.6 | ,/Drainage and sewage work | ||||
12.1.7 | /fence and gate | ||||
12.2 | /building work | ||||
12.2.1 | /power house(engine hall) | ||||
12.2.2 | /power house (control room) | ||||
12.2.3 | /workhouse and warehouse | ||||
12.2.4 | /pump house | ||||
12.2.5 | /Administration bulilding | ||||
12.2.6 | / guard house | ||||
12.3 | /building service | ||||
12.3.1 | /sanitary system | ||||
12.3.2 | /overhead crane for power house | ||||
12.3.3 | /chain block hoist for pump house | ||||
12.4 | /fire detection and fighting system | ||||
13. /first filling and consumables | |||||
13.1 | /first filling of system | ||||
13.1.1 | /lube oil for genset | ||||
13.1.2 | /lube oil for black starter | ||||
13.1.3 | /chemicals for cooling and boiler water treatment | ||||
13.2 | /consumables for commissioning | ||||
13.2.1 | /Fuel | ||||
13.2.2 | /lube oil for genset | ||||
14. /engineering | |||||
14.1 | /system engineering | ||||
14.1.1 | /system engineering | ||||
14.2 | /mechnical engineering | ||||
14.2.1 | /equipment layout drawing in&out door | ||||
14.2.2 | /piping arrangement drawing | ||||
14.3 | /electrical engineering | ||||
14.3.1 | /electrical engineering for diesel power plant | ||||
14.3.2 | /power and electrical protect coordination engineering | ||||
14.4 | /civil engineering | ||||
15. /site activities | |||||
15.1 | /supervision | ||||
15.1.1 | /civil engineer for civil work | ||||
15.1.2 | /mech. engineer for installation | ||||
15.1.3 | /elec. Engineer for installation | ||||
15.2 | /commissioning | ||||
15.2.1 | ()/mech. Engineer for commissioning | ||||
15.2.2 | ()/elec. Engineer for commissioning | ||||
15.2.3 | (PLC)/PLC engineer for commissioning | ||||
15.2.4 | ()/Auxiliaries mech. Engineer for commissioning | ||||
15.2.5 | ()/Auxiliaries elec. Engineer for commissioning | ||||
15.3 | Extra required supervision, commissioning service by purchaser | ||||
16. /factory test and training service | |||||
16.1 | /shop test | ||||
16.1.1 | /engine and generator test at factory | ||||
16.1.2 | () | 3 | |||
16.2 | /training | ||||
16.2.1 | /training at site | ||||
17. /transportation | |||||
17.1 | /packing of equipment for transportation | ||||
17.1.1 | /packing of engine and aux.equipment | ||||
17.2 | /transportation of equipment | ||||
17.2.1 | /domestic transportation | ||||
17.2.2 | / transportation to local port | ||||
17.2.3 | /local transportation to site |
/No. | /Item | /Q'ty | /specification | /Scope | |
CMP | Customer | ||||
1./Genset | |||||
1.1 | diesel engine | 3 | CMP-MAN 7L27/38 | ||
One (1) set of diesel engine including following items | |||||
1.1.1 | /Turbocharger | 1 | / With air inlet bend | ||
1.1.2 | /Charger Air Cooler | 1 | Fin and tube type | ||
1.1.3 | /Governor | 1 | |||
1.1.4 | /Flywheel | 1 | |||
1.1.5 | / Common base | 1 | |||
1.1.6 | / Turning device | 1 | /manual operating | ||
1.1.7 | / Starter | 1 | /Pneumatic | ||
1.1.8 | /Lub. oil cooler | 1 | /Plate type | ||
1.1.9 | /Duplex filter | 1 | |||
1.1.10 | /centrifugal by-pass filter | 1 | |||
1.1.11 | / pump for Lub.oil | 1 | /Engine driven | ||
1.1.12 | /Pre-lub. oil pump | 1 | /electrical pump | ||
1.1.13 | /Lub. oil thermostatic valve | 1set | /wax type | ||
1.1.14 | /HT water pump | 1 | /Engine driven | ||
1.1.15 | / HT thermostatic valve | 1set | /wax type | ||
1.1.16 | /Fuel oil leakage alarm | 1 | |||
1.1.17 | /duplex safety filter for fuel | 1 | |||
1.1.18 | /Resilient mountiung | /selected according to alculation | |||
1.1.19 | /flexible hoses for engine all connection | 1lot | |||
1.1.20 | Service platform | 1 | |||
1.2 /Generator | |||||
1.2 | /Generator | 3 | :2217.6kW/rating output from generator terminal is 2217.6kW , |
||
- /Capacity | 2772kVA / 750 rpm at ISO condition | ||||
- /No. of phase and wire | 3 phase / 4 wire / PF 0.8 | ||||
- /Voltage and frequency | 11V / 50 Hz | ||||
- Insulation Class/Temp.Rise | F/F | ||||
- /IP Class | IP23 | ||||
- /Electric system parts | /Maker's standard | ||||
/ One(1) set of Generator including following items ; | |||||
1.2.1 | /AVR | ||||
1.2.2 | / Space heater | ||||
1.2.3 | /Bearing sensor | ||||
1.2.4 | /Winding sensor | ||||
2. fuel oil system | |||||
2.1 | / HFO treatment process unit | 1 | xxxcSt/50ºC/design according toxxxcSt/50ºC HFO | ||
One (1) set of HFO treatment process unit including following items | |||||
2.1.1 | /HFO purifier unit | 1+1 | ,1500L/h /one use and the other reserve,effective separating amount approx850L/h | ||
2.2 | /Diesel oil supply process unit | 1 | |||
One (1) set of Diesel oil supply process unit including following items | |||||
2.2.1 | /Do supply pump | 1+1 | ,2.5m3/h/one use and the other reserve,rate of flow is approx2.5m3/h | ||
2.2.2 | /press. regulatuiong valve | 1 | |||
2.2.3 | /press. regulatuiong valve | 1 | |||
2.2.4 | / DO cooler | 1 | 15kW/approx 15kW | ||
2.3 | /HFO supply unit | 1 | xxxcSt/50ºC/design according toxxxcSt/50ºC HFO | ||
One (1) set of Diesel oil supply process unit including following items | |||||
2.3.1 | /HFO supply pump | 1+1 | ,1.2m3/h/one use and the other reserve,rate of flow is approx 1.2m3/h | ||
2.3.2 | /filter | 1 | |||
2.3.3 | /junction box | 1 | |||
2.3.4 | , base frame, support and pipe | 1lot | |||
2.4 | /HFO booster unit | 1 | xxxcSt/50ºC/design according toxxxcSt/50ºC HFO | ||
One (1) set of Diesel oil supply process unit including following items | |||||
2.4.1 | /auto back flushing filter | 1 | |||
2.4.2 | /return oil tank witth deaerating valve | 1 | |||
2.4.3 | /recycling oil pump | 1+1 | ,3.5m3/h/one use and the other reserve,rate of flow is approx 3.5m3/h | ||
2.4.4 | /heater | 1 | |||
2.4.5 | /viscosity control unit | 1 | |||
2.4.6 | /change-over valve for HFO /DO | 1 | |||
2.4.7 | ,,,/pipe, supprort,flange and base frame | 1 | |||
2.4.8 | / cooler | 1 | |||
2.4.9 | /press. regulatuiong valve | 1 | |||
2.5 | / fuel oil discharging process | ||||
2.5.1 | /leakage fuel oil collecting tank | 3 | 100L/approx 100L | ||
2.5.2 | /fuel oil drain pump | 3 | /pneumatic dredge pump | ||
3. Lubricating oil system | |||||
3.1 | /Lubricating oil treatment process | ||||
3.1.1 | / Lub. oil separator unit | 3 | ,760L/h/ steam heater,effective separating amount approx 230L/h | ||
3.2 | /lube pump system | 1 | |||
4. Cooling water system | |||||
4.1 | () Engine cooling water system(one-string system) | ||||
4.1.1 | /Expansion tank | 1 | 1.5m3/approx 1.5m3 | ||
4.1.2 | /LT water pump | 3 | /electrical driven | ||
4.1.3 | /air radiator | 3 | |||
4.1.4 | / Preheater Unit | 1 | |||
4.2 | /Cooling water supply system | ||||
4.2.1 | /Water treatment unit | 1 | |||
4.2.2 | /Water tank and perssurised system | 1 | |||
5. Compressed air system | |||||
5.1 | /air compressor | 1 | |||
/ One(1) set of air compressor unit including following items ; | |||||
5.1.1 | /air conpressor | 2 | 11/air conpressor one use and the other reserve | ||
5.1.2 | / comperssed air vessel | 2 | ,1.5m3/one use and the other reserve approx 1.5m3 | ||
5.1.3 | /Reduce pressure unit | 1 | 30bar8bar | ||
5.1.4 | /air dryer | 1 | |||
6. , Intake and exhaust gas system | |||||
6.1 | /Intake air system | ||||
6.1.1 | /Intake air filter | 3 | |||
6.1.2 | /Intake air silencer | 3 | |||
6.1.3 | /expansion joint forT/C inlet | 3 | |||
6.2 | /Exhaust gas system | ||||
6.2.1 | /exhaust gas silencer | 3 | |||
6.2.2 | /Expansion joint for T/C outlet | 3 | |||
6.2.3 | /Expansion joint for exhaust gas silencer in/out | 3 | |||
6.2.4 | /Exhaust gas stack | ||||
6.3 | /exhaust gas boiler system | ||||
6.3.1 | /Exhaust gas boiler | 3set | |||
6.3.2 | /Hot well tank | 1 | |||
6.3.3 | /Temp. control valve for Hot well tank | 1 | |||
6.3.4 | /condensator radiator | 1 | |||
6.3.5 | /steam distribution head | 1 | |||
6.3.6 | /Blow down tank | 1 | |||
6.3.7 | /feed water pump unit | 1set | 2,/every set include two pumps,one use and the other reserve | ||
6.3.8 | /chemical dosing unit | 1 | |||
7. Sludge oil treatment system | |||||
7.1 | /waste oil discharge pump | 1+1 | |||
7.2 | /engine room pit pump | 1+1 | |||
7.3 | /pump room pit pump | 1+1 | |||
8. Tank farm | |||||
8.1 | /tanks | ||||
8.1.1 | /HFO storage tank | 1 | 700M3 | ||
8.1.2 | / heater for HFO outlet the tank | 1 | |||
8.1.3 | 1 | 100m3 | |||
8.1.4 | /HFO service tank | 1 | 100m3 | ||
8.1.5 | /DO storage tank | 1 | 100m3 | ||
8.1.6 | /DO service tank | 1 | 100m3 | ||
8.1.7 | /New lub. oil storage tank | 1 | 100m3 | ||
8.1.8 | /Used lub. oil storage tank | 1 | 50m3 | ||
8.1.9 | /Oily Water Pond | 1 | |||
8.1.10 | /sludge tank | 1 | 50m3 | ||
8.2 | /Raw water supply system | ||||
9. Electrical System | |||||
9.1 | /Engine control cabinet | 3 | |||
9.2 | /outgoing cabinet | 1 | |||
9.3 | /insulate cabinet | 1 | |||
9.4 | /auxiliaries equipment cabinet | 3 | |||
9.5 | /Common auxiliaries equipment cabinet | 1 | |||
9.6 | /transform incoming cabinet | 1 | |||
9.7 | /transform outgoing cabinet | 1 | |||
9.8 | /plant transform | 1 | |||
9.9 | /PT cabinet | 1 | |||
9.10 | /Black start genset | 1 | |||
9.11 | /Black start engine cabinet | 1 | |||
9.12 | /central control | 1 | |||
9.14 | /DC system | 1 | |||
10. Spare parts | |||||
10.1 | /Engine spare parts | ||||
10.1.1 | /Standard spare parts for engine | 1set/plant | |||
10.1.2 | /commissioning spare parts for engine | 1set/plant | |||
10.2 | /Plant spare parts | ||||
10.2.1 | /spare parts for generator | 1set/plant | |||
10.2.2 | /spare parts for auxiliaries | 1set/plant | |||
10.3 | /engine tools | ||||
10.3.1 | /Standard tools for engine | 1set/plant | |||
10.4 | /plant tools | ||||
10.4.1 | /tools for mechnical equipment | 1set/plant | |||
10.4.2 | /tools for electrical panel | 1set/plant | |||
11. , piping and electrical material & work | |||||
11.1 | /Material | ||||
11.1.1 | /Materials for civil and foundation items | ||||
11.1.2 | /Materials for mechnical items | ||||
11.1.3 | /Materials for electrical items | ||||
11.2 | / guide installation work | ||||
11.2.1 | /installation/erection works for mechnical items | ||||
11.2.2 | /installation/erection waorks for electrical items | ||||
12. , civil & building material & work | |||||
12.1 | /civil work | ||||
12.1.1 | /site survey | ||||
12.1.2 | /site grading and leveling | ||||
12.1.3 | /Temporary faclity | ||||
12.1.4 | /road and paving | ||||
12.1.5 | /foundation and structure | ||||
12.1.6 | ,/Drainage and sewage work | ||||
12.1.7 | /fence and gate | ||||
12.2 | /building work | ||||
12.2.1 | /power house(engine hall) | ||||
12.2.2 | /power house (control room) | ||||
12.2.3 | /workhouse and warehouse | ||||
12.2.4 | /pump house | ||||
12.2.5 | /Administration bulilding | ||||
12.2.6 | / guard house | ||||
12.3 | /building service | ||||
12.3.1 | /sanitary system | ||||
12.3.2 | /overhead crane for power house | ||||
12.3.3 | /chain block hoist for pump house | ||||
12.4 | /fire detection and fighting system | ||||
13. /first filling and consumables | |||||
13.1 | /first filling of system | ||||
13.1.1 | /lube oil for genset | ||||
13.1.2 | /lube oil for black starter | ||||
13.1.3 | /chemicals for cooling and boiler water treatment | ||||
13.2 | /consumables for commissioning | ||||
13.2.1 | /Fuel | ||||
13.2.2 | /lube oil for genset | ||||
14. /engineering | |||||
14.1 | /system engineering | ||||
14.1.1 | /system engineering | ||||
14.2 | /mechnical engineering | ||||
14.2.1 | /equipment layout drawing in&out door | ||||
14.2.2 | /piping arrangement drawing | ||||
14.3 | /electrical engineering | ||||
14.3.1 | /electrical engineering for diesel power plant | ||||
14.3.2 | /power and electrical protect coordination engineering | ||||
14.4 | /civil engineering | ||||
15. /site activities | |||||
15.1 | /supervision | ||||
15.1.1 | /civil engineer for civil work | ||||
15.1.2 | /mech. engineer for installation | ||||
15.1.3 | /elec. Engineer for installation | ||||
15.2 | /commissioning | ||||
15.2.1 | ()/mech. Engineer for commissioning | ||||
15.2.2 | ()/elec. Engineer for commissioning | ||||
15.2.3 | (PLC)/PLC engineer for commissioning | ||||
15.2.4 | ()/Auxiliaries mech. Engineer for commissioning | ||||
15.2.5 | ()/Auxiliaries elec. Engineer for commissioning | ||||
15.3 | Extra required supervision, commissioning service by purchaser | ||||
16. /factory test and training service | |||||
16.1 | /shop test | ||||
16.1.1 | /engine and generator test at factory | ||||
16.1.2 | () | 3 | |||
16.2 | /training | ||||
16.2.1 | /training at site | ||||
17. /transportation | |||||
17.1 | /packing of equipment for transportation | ||||
17.1.1 | /packing of engine and aux.equipment | ||||
17.2 | /transportation of equipment | ||||
17.2.1 | /domestic transportation | ||||
17.2.2 | / transportation to local port | ||||
17.2.3 | /local transportation to site |